NEOM – Saudi Arabia
Gigaproject’s infrastructure, one of the world’s largest transportation and
utility infrastructure projects
Activity: design of mountain running tunnels leading to NEOM city
Midas model of designed tunnel’s junction
Material: reinforced concrete
Span: 15.5 m
Midas model of designed tunnel’s junction
Material: reinforced concrete
Span : 10.1 m
Vaughan Street Underbridge – Australia
Activity: Load rating, fatigue and seismic analysis of th bridge
Material : Steel
Span : 16.5 m
Applied connections: Rivets
Vaughan Street Underbridge – model in Midas Civil
Rushcutters Bay Viaduct – Australia
Activity: Load rating and fatigue analysis
Material: post tensioned concrete
Total span : 420 m (5 span continuous beam)
Oxley Wharf Extension - Australia
Oxley Wharf Extension - Midas model
Activity: Internal check of static calaculations by independent design
Material :
- reinforced concrete deck (height of deck= 800 mm)
- steel piles filled by concrete (diameter of piles = 914 mm)
Sydney Gateways leading to Sydney Airport – Australia
Activity: Static anf fatigue analysis
Material: steel
Span: 25 m
Connectors: bolts
Gordie Howe International Bridge USA – Canada
activity: managing droup of drafters in preparations of drawings. Viaduckt leading to Hordie Howe bridge were designed.
Plan of designed bridges leading to Gordie Howe bridge
Footbridge formation - Poland
activity: work on construction site as construction site engineer
material: pretensioned concrete girders, reinforced concrete deck and supports
High Speed 2 - United Kingdom
Activity:
- Structural preliminary design of road bridges and footpaths across High Speed 2 railway line
- BIM modelling
Material: Prestressed concrete girders, reinforced deck and substructure
A14 from Cambridge to Huntingdon - Improvement Scheme, England
Activity: Design of main girders, transverse bracings, concrete deck, concrete diaphragm and piles Material: Composite steel and concrete main girders, reinforced concrete substructure
Span: 40.0 m
Modernisation of railway station in Eidsvoll– Norway
Activities: - Calculation of steel frames for electrification over track,
- Calculating the stability and ground capacity of the retaining walls along the railway,
- Calculations of the plate and pile foundations under traction masts.
Project of frame concrete bridge along motorway between Sonder Borup-Assentoft- Denmark
Activities:
Static analysis of the bridge supports;
Calculating ultimate bearing capacity of foundations;
Design reinforcement of walls and foundations.
Bridges and animal pathways along motorway no. S-8 in Poland
Activity: Design of substructure, preparing general and reinforced drawings of all the bridge
Material: Prestressed concrete (superstructure), reinforced concrete (substructure)
Motorway no. S-8 in Poland – cross section of designed bridge
Material: Prestressed concrete
Span: 2 x 21.5 m
Design and construction of footpath above Grochowska street in Warsaw, the truss footbridge with concrete deck.
Activities:
- Project od balustrade,
- Static design of concrete deck,
- Preparing Auto Cad workshop drawings of balustrade,
- Design of foundations,
- Design of steel frame for a lift,