Dorota Kopeć - Portfolio

NEOM – Saudi Arabia

Gigaproject’s infrastructure, one of the world’s largest transportation and

utility infrastructure projects

Activity: design of mountain running tunnels leading to NEOM city

Midas model of designed tunnel’s junction

Material: reinforced concrete

Span: 15.5 m

Midas model of designed tunnel’s junction

Material: reinforced concrete

Span : 10.1 m

Vaughan Street Underbridge – Australia

Activity: Load rating, fatigue and seismic analysis of th bridge

Material : Steel

Span : 16.5 m

Applied connections: Rivets


Vaughan Street Underbridge – model in Midas Civil


Rushcutters Bay Viaduct – Australia

Activity: Load rating and fatigue analysis

Material: post tensioned concrete

Total span : 420 m (5 span continuous beam)

Oxley Wharf Extension - Australia

Oxley Wharf Extension - Midas model

Activity: Internal check of static calaculations by independent design

Material :

- reinforced concrete deck (height of deck= 800 mm)

- steel piles filled by concrete (diameter of piles = 914 mm)

Sydney Gateways leading to Sydney Airport – Australia

Activity: Static anf fatigue analysis

Material: steel

Span: 25 m

Connectors: bolts

Gordie Howe International Bridge USA – Canada

activity: managing droup of drafters in preparations of drawings. Viaduckt leading to Hordie Howe bridge were designed.

Plan of designed bridges leading to Gordie Howe bridge

Footbridge formation - Poland

activity: work on construction site as construction site engineer


material: pretensioned concrete girders, reinforced concrete deck and supports

High Speed 2 - United Kingdom

Activity:

- Structural preliminary design of road bridges and footpaths across High Speed 2 railway line

- BIM modelling

Material: Prestressed concrete girders, reinforced deck and substructure

A14 from Cambridge to Huntingdon - Improvement Scheme, England

Activity: Design of main girders, transverse bracings, concrete deck, concrete diaphragm and piles Material: Composite steel and concrete main girders, reinforced concrete substructure

Span: 40.0 m

Modernisation of railway station in Eidsvoll– Norway

Activities: - Calculation of steel frames for electrification over track,

- Calculating the stability and ground capacity of the retaining walls along the railway,

- Calculations of the plate and pile foundations under traction masts.

Project of frame concrete bridge along motorway between Sonder Borup-Assentoft- Denmark

Activities:

Static analysis of the bridge supports;

Calculating ultimate bearing capacity of foundations;

Design reinforcement of walls and foundations.

Bridges and animal pathways along motorway no. S-8 in Poland

Activity: Design of substructure, preparing general and reinforced drawings of all the bridge

Material: Prestressed concrete (superstructure), reinforced concrete (substructure)

Motorway no. S-8 in Poland – cross section of designed bridge

Material: Prestressed concrete

Span: 2 x 21.5 m

Design and construction of footpath above Grochowska street in Warsaw, the truss footbridge with concrete deck.

Activities:

- Project od balustrade,

- Static design of concrete deck,

- Preparing Auto Cad workshop drawings of balustrade,

- Design of foundations,

- Design of steel frame for a lift,

- Preparing Auto Cad drawings of stairs and concrete deck.